Featured Project: Plasdwr
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla euismod condimentum felis vitae efficitur. Sed vel dictum quam, at blandit leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla euismod condimentum felis vitae efficitur. Sed vel dictum quam.

What happened?
The client asked us to produce the
design of a sewer passing below a river
and a rail line.
The main challenge was the tight
deadline to allow for construction.

Support the client
Macfema Ltd carry out a design
using a 2D FEM model as well as empirical analyses. Due to the tight deadline, Macfema hired 3
temporary staff to support the delivery.

Achievement
The solution proposed by Macfema
met the end clients (Network Rail, EA and local council)
expectations.
The use of experienced temporary
staff increaseMacfema’s capability and reduced the design time keeping the same quality and accuracy.

