tfln054

Featured Project: TfL N054

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla euismod condimentum felis vitae efficitur. Sed vel dictum quam, at blandit leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla euismod condimentum felis vitae efficitur. Sed vel dictum quam.

What happened?

The client asked us to engage with 
all the internalstakeholder and 
propose design solution for the highest embankment in the network with 
lowest condition rating. 
The design of this embankment has 
been postponed by the client f
or several years due to many constraints.

Support the client

Macfema Ltd designed a single solution for the whole
embankment taking in consideration allthe possible constraints about access, 
constructability and any disturbance to the local residents.

Achievement

The solution proposed by Macfema Ltd was accepted by TfL. 
This resolved a very long‑standing issue with local traffic restrictions 
not needed anymore.The design also included a low carbon footprint 
solution.

INSPIRED

© Copyright. All rights reserved.

Information icon

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.