Featured Project: Woodisde Earthworks
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla euismod condimentum felis vitae efficitur. Sed vel dictum quam, at blandit leo. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla euismod condimentum felis vitae efficitur. Sed vel dictum quam.

What happened?
The client asked us to produce
the temporary works design including the reconstruction of a rail
embankment.
The construction works had to
be completed during a weekend.

Support the client
Macfema Ltd designed the most
practical solution making lean the number and type of construction stages which including placing
a rectangular concrete frame at
the base of the excavation.

Achievement
The solution proposed by Macfema Ltd was appreciated bythe end client
and gave us more visibility in
a niche sector (temporary works)
that the big consultants generally
try to avoid due to the high risks
involved.